Anhui Continental AG Project

Location: China, Anhui

Solution:
16 MW/ 40 MWh commercial and industrial energy storage program

Project size:
16 MW/ 40 MWh

Scope:
8 sets of GridUltra 5018 air-cooled energy storage battery compartments,
8 converter transformer compartments each with a 2MW rated power.

Project Outline:
Covering an area of 2,500 square meters, this project consists of eight GridUltra 5018 containerized energy storage systems. Once connected to the grid, it will reduce electricity costs for Continental AG and balance the power consumption at their Hefei production base, alleviating power strain during peak usage times.

This project showcases how energy storage solutions can optimize industrial energy use and contribute to cost savings and grid stability.